NEWCASTLE AIRPORT AWNINGS
The project was completed in less than 10 weeks by our specialist cladding team.
The JA Crockett team, fabricators and suppliers delivered a top-quality job. The fact that not a single panel was measured wrong in the entire process speaks to the level of professionalism of our team,! The awnings presented some major design challenges, and supply of the panels also proved problematic, with a 14 week wait for delivery. When a manufacturing fault delivered numerous faulty sheets, the long wait times on more product necessitated a complete reworking of our initial cutting plan to achieve the same outcome with fewer panels.
The very last sheet was used for the very last few pieces of the project. A perfect example of cutting it fine!
Products Used: 1300m2 of Vitradual in a specially ordered Tiger Chromatic Orange for the project.
Builder: Construction Control
Architect: Cox
The JA Crockett team, fabricators and suppliers delivered a top-quality job. The fact that not a single panel was measured wrong in the entire process speaks to the level of professionalism of our team,! The awnings presented some major design challenges, and supply of the panels also proved problematic, with a 14 week wait for delivery. When a manufacturing fault delivered numerous faulty sheets, the long wait times on more product necessitated a complete reworking of our initial cutting plan to achieve the same outcome with fewer panels.
The very last sheet was used for the very last few pieces of the project. A perfect example of cutting it fine!
Products Used: 1300m2 of Vitradual in a specially ordered Tiger Chromatic Orange for the project.
Builder: Construction Control
Architect: Cox